Mineral Processing EPC

Engineering Consulting
Engineering Consulting

engineering consulting makes clients have a comprehensive understanding of the value of mine,available mineral processing technology

more info
Mineral Processing Test
Mineral Processing Test

the clients should provide about 50g representative samples, some special samples about 200~1000g. the simple test needs 30 working days

more info
Mines Design
Mines Design

the key to mine design is all must be established on the basis of detailed investigation, and therefore xinhai mine design

more info
Equipment Manufacture
Equipment Manufacture

equipment manufacture is in the charge of xinhai mine production plants that covers an area of 100 mu, and are divided into 3 production plants

more info
Installation & Commissioning
Installation & Commissioning

installation and commission is key link of realizing dressing test, mine designand equipment manufacture, and directly takes

more info
Personnel Training
Personnel Training

it is simultaneous for worker training and installation & commission in order to save time and cost. worker training has two purposes

more info
Designed Capacity Reached
Designed Capacity Reached

the target reached of xinhai epc includes expected recovery rate reached, design capacity for clients reached, the quality of product reached

more info

About us

Xinhai concentrates on providing the Turnkey Solution for Mineral Processing Plant, that is research and design- complete equipment manufacturing and procurement- commissioning and delivery"